- Project Peak to Peak Charter School
- Location Lafayette, Colorado
- Type of Precast CarbonCast High Performance Insulated Wall Panels
- CarbonCast Surface Area 13,000 sq. ft.
- Architect H+L Architecture
- Engineer KL&A, Inc.
- Contractor Fransen Pittman Construction Co., Inc.
- Owner Peak to Peak Charter School
- Precaster Rocky Mountain Prestress
• Expansion and addition to Colorado’s top ranked public high school.
• Gymnasium walls with a steel framed clerestory and roof.
• CarbonCast High Performance Insulated Wall Panels: load-bearing, architectural precast concrete walls.
• Approximately 42 pieces.
• Approximately 325 cubic yards.
• Thin CMU soaps and board form finish.
• 2-pass trowel finish.