- Project Dollar General Distribution Center
- Location Bessemer, Alabama
- Type of Precast CarbonCast High Performance Insulated Wall Panels
- Architect Leo A Daly
- Contractor Clayco Construction
- Precaster Metromont
Most warehouses are big gray boxes with little detail or style, but Dollar General wanted something different for its facility, which also serves as a hub for more than 600 employees. Metromont used a custom formliner replicating an enlarged tire tread pattern that could be embedded into each of the façade’s 2” x 5” x 2” load-bearing CarbonCast High Performance Insulated Wall Panels.